Adesa Organic Farm

Maple Creek, California

Tesla

Multiple Locations

Marimba One

Arcata, California

A birds-eye view of an active McKeever construction site in Maple Creek, California.
Eureka Arcata Airport Microgrids

Airport Microgrid
Arcata-Eureka Airport, CA
Customer: Tesla, Inc

  • 3MW PV DC-DC coupled microgrid +1MW Grid-Tied PV

  • 3MW Energy Storage (Tesla Megapacks)

  • 480VAC: 12kVAC Switchgear, utility (PG&E) interconnection

Solar panels for a greenhouse facility in Thermal, California.

Greenhouse Facility
Thermal, CA
Customer: North Shore Greenhouses, Inc.

  • Full MEP+EMCS Construction of (7)
    60,000 square-foot greenhouse facilities

  • 500kW Grid-Tied PV Array, utility
    (Imperial Irrigation District) i
    nterconnection

  • 4000 Amp 480: 277VAC meter main
    service

California's first microgrid in Blue Lake, California, installed by McKeever.

California's First Microgrid
Blue Lake, CA
Customer: REC Solar

  • 500kW PV Array

  • BESS & Microgrid Controls

  • Utility (PG&E) Interconnection

Solar Panels

Sawmill Solar
Arcata, CA
Customer: JP Arcata

  • 550kW Grid-Tied PV Array, utility (PG&E)
    interconnection

  • Re-roof and structural/seismic upgrades,
    EV Chargers

  • 3000A 480: 277VAC meter main service
    upgrades

Nate McKeever and a client walking towards an E-bus for the Humboldt Transit Authority.

Transit Facility Microgrid & E-bus Chargers
Eureka, CA
Customer: Humboldt Transit Authority (HTA)

  • Campus-wide PV Arrays & Lighting
    Retrofits

  • Campus-wide BESS and Microgrid
    Controls

  • (5) eBus chargers

Mckeever installing a V2G (vehicle to grid) charger for Eureka School District.

Microgrid + V2G

Eureka, CA
Customer: Willdan Performance

  • 250kW PV array

  • 1600A 480: 277VAC Meter Main Service
    with MG Controls, utility (PG&E)
    interconnection

  • 1MW BESS, (4) eBus V2G (Vehicle to Grid)
    Chargers

Steps up to Founders Hall at Cal Poly Humboldt

Seismic Retrofit
Arcata, CA
Customer: Thompson Builders, Inc

  • Division 26 Electrical Scope of Work

  • Cal Poly Humboldt, Library & Theater

  • CM Services